快速安装铝合金管路

News classification

Product Category

Contact Us

Dalian caseberg equipment manufacturing co. LTD

Marketing center: dalian Shahekou District changxing street 137-139 fuhung international tower B 2301

Mail box: info@dlcosbog.com

Negotiation hotline: +86-0411-62278511

Contact number: +86-18018919688

Company website: WWW dlcosbog.com


Kesberg fluid technology (qingdao) co.LTD

Marketing center:137 Yanqing Road, Huanxiu office, Jimo District, Qingdao


Small make up for you to quickly install aluminum alloy pipeline knowledge

Your current location: Home page >> News >> Company news

Small make up for you to quickly install aluminum alloy pipeline knowledge

Date of release:2019-01-09 Author: Click:

Domestic installation floor heating conduit must calculate the dosage of good pipe material ahead of time. Before domestic installation ground heating conduit must measure good indoor need tube material how many, the metre number of conduit, it is to want to measure beforehand good. Measure the amount of good pipe in advance, also can make the floor heating pipe installed quickly.


Only after the above two points are determined, can the water supply and drainage through the beam casing be embedded correctly in the construction stage of the main structure of civil engineering. This can avoid the situation that water supply pipe appears in dining-room or sitting room, also can avoid kitchen drain branch pipe to affect later period decorate condole top. If the water supply branch pipe inevitably goes to the dining hall, the embedded sleeve of the water supply branch pipe must also be embedded against the wall. In the later stage, the branch pipe must be installed as close to the wall as possible. Consider the owner decoration ceiling can conceal water supply branch pipe.


Quick installation of aluminum alloy pipeline said, connected to the mixing pump all-in-one machine pipeline, usually 2~3 people cooperative device power is higher. When installing the pipeline, it should first check whether the pipeline is made of the residual concrete from the previous construction and whether it is cleaned in place. Otherwise, the concrete will simply be blocked when it is transported. It is also important to have an accurate receiving sequence, or the concrete mixer will simply cause the pipe to crack from the joint during pumping.


Auxiliary connecting materials of FRP pipe mainly include reinforced materials such as glass fiber yarn, cut felt and glass fiber cloth, matrix materials such as resin, curing agent, accelerator, anti-aging agent and various kinds of cement, etc. These materials must be classified and stored in a dry place without direct sunlight. The rubber ring should be protected from the sun and kept away from the heat source. Pipes and fittings should be piled up according to type, specification and grade. Soft liner should be added between layers. Keep away from heat source and inflammable and explosive goods.


大连快速安装铝合金管路

The address of this article:http://www.dlcosbog.com/en/news/425.html

Key word:Dalianquickinstallationofaluminumalloypipeline,Quickinstallationofaluminumalloypipingmanufacturers,Quicklyinstallaluminumalloypiping

Recently browse:

  • Service
  • number
    18018919688
  • Message
  • web site
  • Online Service